Media and broadcast
Production facilities, studios and edit suites with equipment and content that cannot be replaced by an insurer.
Pyrmont concentrates media, technology and hospitality on a small peninsula of converted wharf buildings and newer development. The tenants tend to run infrastructure that matters more than the building around it.
Production facilities, studios and edit suites with equipment and content that cannot be replaced by an insurer.
Open-plan tenancies in converted wharf and warehouse buildings, with significant on-premises infrastructure.
Accommodation and mixed-use towers around the harbour edge and the casino precinct.
Pyrmont sits on a low peninsula surrounded by water on three sides, with a building stock that mixes nineteenth-century wharf and industrial structures with development from the last thirty years.
In a media or production business, the building is replaceable and the material inside it frequently is not. Footage, masters, archives and work in progress represent the actual value, and a good deal of it may sit on local storage rather than somewhere else.
That determines our sequence. Before extraction, before drying, we work out where the storage and the archives are and get water away from them — diverting, sheeting, and moving what can safely be moved. A wet floor is a scheduling problem; a lost archive is not recoverable at any price.
Studios, edit suites and control rooms are full of acoustic treatment, cabling and equipment, and all three complicate drying. Acoustic panels and foam are highly absorbent and dry very slowly. Floor voids and cable trays hold water where you cannot see it. Equipment is sensitive to both humidity and dust.
We treat those rooms separately from the general office. Absorbent acoustic material that has been substantially wet usually has to come out rather than be dried, because the alternative is mould inside a panel on a studio wall. We say that early, since it affects both the cost and the timeline.
The converted wharf and warehouse buildings that give Pyrmont its character present the same challenge as Melbourne’s industrial conversions: heavy original fabric with contemporary services threaded through it, and very little accessible service void to inspect.
Finding the source in those buildings takes longer, because the pipework does not run where drawings suggest and the water travels along timber and steel members before it appears. We allow for that in the investigation rather than assuming the leak is directly above the stain.
Call now. If storage, archives or studio equipment are at risk, tell us first and we will protect those before anything else.
(03) 7035 0623Get water away from them before anything else — sheeting over racks and cabinets buys real time, and moving what can safely be moved is worth doing immediately. Do not power up anything that has been wet. Tell us on the phone that archives or storage are involved and we will arrive treating that as the priority rather than the floor.
Lightly affected ones sometimes. Substantially wet acoustic foam and fabric-wrapped panels generally cannot be dried reliably, because they hold moisture deep in the material and support mould growth inside a panel where nobody will see it until it smells. We would rather tell you they need replacing at the start than dry them and have you rebuild the studio in six months.
It slows the investigation more than the drying. Services in these conversions run wherever they could be threaded, and water travels along heavy timber and steel members before it shows itself, so the stain is often nowhere near the source. We allow proper time to trace it rather than opening up the ceiling directly above the damp patch and hoping.
Yes. Production and broadcast schedules are fixed well in advance and expensive to move, so we work in the gaps — overnight, between shoots, around booked studio time. Tell us the schedule and we will plan to it. What we will flag is any point where working around it would let damage get materially worse.