Multi-floor escape of water
Riser, sprinkler and hydrant failures that track down through several tenancies before anyone finds the source.
A failed riser on level 22 does not stay on level 22. Floodrest works the Melbourne CBD grid for building managers and tenancy coordinators — containing the spread, drying floor by floor, and keeping the tenancies below trading while we do it.
Riser, sprinkler and hydrant failures that track down through several tenancies before anyone finds the source.
Attendance outside trading hours so extraction and containment happen while the floors are empty, not while staff are at desks.
Separate documentation per affected tenancy, so the building’s claim and each tenant’s claim can be settled independently.
CBD losses are rarely about the volume of water. They are about how far it travels before it is found, and how many separately-occupied tenancies it crosses on the way down.
The CBD grid runs from Spencer Street to Spring Street and Flinders to La Trobe, and the building stock inside it is anything but uniform. There are 1980s and 1990s commercial towers with concrete slabs, suspended ceilings and carpet tile throughout. There are premium-grade towers on Collins and Bourke with raised access flooring and dense under-floor cabling. There are heritage buildings on the smaller streets and lanes where the floors are timber, the walls are solid masonry and there is no easy way to get an air mover where it needs to go.
Each of those needs a different drying approach. A concrete slab with carpet tile can often be dried in place by floating the tiles and running the air across the slab. A raised access floor needs the panels lifted and the void treated as its own drying chamber. A heritage timber floor needs a slower, monitored approach, because pushing it too hard causes cupping and splitting that costs more to fix than the original loss.
The restoration itself is well-understood work. Getting to it in a CBD tower is the part that goes wrong. Equipment goes up in a goods lift that has to be booked. There is an induction. There is a permit for hot works and often one for after-hours access. Loading dock windows are tight and shared with every other trade in the building.
We plan for that rather than being surprised by it. Our crews carry building inductions for a good number of CBD properties, and when we do not have one we work with the building manager to get it done as part of the make safe rather than after. Where a floor cannot be shut, we stage the work — contain and extract on the first attendance, then dry in sections overnight so the tenancy is usable during business hours.
A CBD loss usually has at least three interested parties: the owners corporation or building owner, the affected tenants, and one or more insurers. Those interests do not always align, and a single combined report tends to serve none of them well.
We document per tenancy. Each affected suite gets its own moisture mapping, photographs, equipment schedule and drying log, referenced back to a single cause-of-loss narrative for the building. Loss adjusters can then assess each claim on its own evidence without having to unpick a bundle.
Call now and we will talk through containment while a crew is being mobilised. Lines are answered 24/7.
(03) 7035 0623Yes, and for most CBD buildings that is the sensible option. Working overnight means we can run extraction and set up drying without competing with staff, visitors and other trades for lift access. Our lines are answered 24 hours, including weekends and public holidays.
We hold inductions for a number of CBD properties already. Where we do not, we treat it as part of the make safe — we get the induction completed as we mobilise rather than losing hours to it. If your building has a specific contractor management system, tell us the name when you call and we will work to it.
Several. Each affected tenancy gets its own moisture readings, photographs, equipment schedule and drying log, all tied back to one cause-of-loss narrative for the building. That lets the building claim and the individual tenant claims be assessed separately without the adjuster having to separate them.
Usually. We contain the wet area, run the noisy equipment overnight where possible, and keep egress paths and amenities open. On a raised access floor we work in sections so only part of the floorplate is out of service at a time. Where a full shutdown genuinely is needed we will say so upfront rather than discovering it midway.