Creative studios and offices
Converted factory floors with open plan, exposed services and equipment that does not respond well to water.
Collingwood and Abbotsford have turned a century of industrial building into studios, offices, breweries and venues. The conversions are inventive; the underlying fabric is old, and it usually decides how the restoration has to be done.
Converted factory floors with open plan, exposed services and equipment that does not respond well to water.
Premises with wet processes, floor wastes and food safety obligations that shape what can be dried and what must go.
Smith Street and Johnston Street bars, restaurants and live venues with cellars, cool rooms and short closure tolerance.
These are working industrial buildings that were repurposed rather than replaced. Roofs, drainage and brickwork are frequently original, and the new use puts loads on them they were never designed for.
Almost everything commercial in these two suburbs was built for manufacturing and has been converted since. That means sawtooth roofs, wide spans, solid brick walls, timber trusses and concrete floors, with modern services threaded through afterwards. The conversions are frequently very good and almost always leave the original fabric doing structural work it has done for a hundred years.
When water gets in, that fabric behaves nothing like a modern commercial building. Solid brick holds moisture and releases it slowly. Old timber trusses and floors move as they dry. Concrete slabs poured without a membrane wick moisture up from the ground indefinitely. The drying plan has to account for all of it.
Breweries, distilleries, roasters and commercial kitchens are a substantial part of the commercial base here, and they bring obligations an office does not. Water damage in a food production area is a food safety event, and the question is not only whether a surface can be dried but whether it can be returned to a condition that satisfies the relevant standard and the local council.
We scope those jobs on that basis. Porous materials in a production area usually come out rather than being dried in place, and we document the cleaning and sanitising steps so that the operator has something to show an inspector before they resume production.
A bar or live venue that loses a Friday and Saturday has lost most of its week. That reality drives the schedule. We will work overnight, we will stage the work around service, and we will be direct about which parts of the venue can safely reopen before the whole job is finished.
Cellars deserve particular attention. They are below grade, poorly ventilated and full of stock and refrigeration plant, which makes them both the most likely place to flood and the slowest part of the building to dry properly. A venue that reopens upstairs while the cellar is still wet is storing up a mould problem for a few months later.
Call now. If it is a food premises or a venue with a cellar, tell us when you ring and we will scope accordingly.
(03) 7035 0623Yes. Water damage in a production area is a food safety matter as well as a building one. Porous materials in the production zone generally come out rather than being dried in place, and surfaces need cleaning and sanitising to a documented standard. We record those steps so you have something concrete to show council or an auditor before you restart.
Often yes, provided the cellar is contained and the drying does not present a hazard to staff or patrons. What we would caution against is treating an open upstairs as job done. Cellars are below grade, poorly ventilated and slow to dry, and a cellar signed off early is a common source of a mould problem a few months later.
Because of what it is built from. Solid brick without a cavity, original timber and slabs poured without a moisture membrane all hold water far longer than plasterboard and modern concrete, and all of them are damaged by drying too aggressively. We work them slower and monitor at depth, which takes more days but avoids cracking, cupping and efflorescence.
Yes. Make safe and permanent repair are separate jobs, and the first one cannot wait for a roofer’s availability. We can contain and divert active ingress, protect what is below it and start drying, so the building is not accumulating further damage while the roof works are organised.